Goldman Plumbing was contracted to convert the Hospitals ground floor level from a Central Warm Water System to a Thermostatic Mixing Valve Warm Water System.
This required the alteration and modification of pipework in numerous locations to accommodate the Thermostatic Mixing Valves.
This project also involved the installation of new hot water ring main throughout the Hospitals Rehabilitation Centre. New hot water heaters and secondary circulation pumps with timer controls were supplied and installed to feed the new ring main.