Healthcare 2020

BlacktownHospital

Emergency replacement of a failed, end-of-life warm water plant using a temporary bypass to keep the hospital running.

Project Overview

Blacktown Hospital - photo 1

Background & Context

Goldman Plumbing was contracted to upgrade one of Blacktown Hospitals warm water systems. The existing system was at end of life and had failed. Goldman Plumbing established a temporary warm water supply from an adjacent system to meet the Hospitals operational requirements.

The Engineering Challenge

The failed heat exchange system was drained, dismantled and removed from site.

Structured Delivery Approach

Goldman Plumbing's Engineers designed an alternate system consisting of 4 x Aleabrax GFX 180 storage heat exchangers to replace the failed LEX warm water heat exchanger.

Final Handover & Results

Goldman Plumbing's Technicians modified the existing pipework to suit the new warm water systems configuration. Thermal insulation and metal sheathing was added to the new pipework to match the existing.

Site coordination with facility managers
Isolation and temporary service planning
Certified system handover and documentation
Primary Goal

Restore Warm Water Without Interrupting the Hospital

Client

NSW Health

Sector

Healthcare

Scope

Failed warm water plant replacement

Method

Temporary bypass supply